Reserve a rack

Small team. Very large door.

We are 18 people and one mountain. We started in 2022 with a fortress the army no longer needed, and one rule: if we can’t protect it, we don’t sell it.

How it started

In 2022 three engineers from Valais bought Anlage 07. Up to 120 m of granite overhead, blast doors at 3.2 tonnes a leaf, and a spring inside the mountain.

We kept the shell and rebuilt everything else for servers. Hall 1 opened in March 2025. We are still small enough to know every client by name, and every cable by its label.

18people, most at the mountain
3founders, all engineers
2022the year we bought the fortress
100%Swiss-owned

Who has which key

Nobody here has a key to everything. Not even the people who own the company. Here is who opens what, and what stays locked.

GateTunnelHall 1Client racksArchive vaultCamera room
NadiaCo-founder, CEOescortedStays lockedStays lockedStays lockedStays lockedStays locked
RetoCo-founder, operationsOpensOpensOpenswith your ticketStays lockedStays locked
AnjaSecurity leadOpensOpensStays lockedStays lockedStays lockedOpens
MarcoNight shift engineerOpensOpensOpenswith your ticketStays lockedStays locked
SamiNetwork engineerOpensOpensOpensStays lockedStays lockedStays locked
LeaArchive and tapeOpensOpensStays lockedStays lockedtwo peopleStays locked
YouClient under contractOpensOpensOpensyour own rackStays lockedStays locked

Why first names and no faces? Most break-ins start with a phone call: someone pretends to be the boss and asks the night shift for a favour. A name with a face makes that easier. And yes, Nadia signs in at the security post like any visitor.

Things we said no to

  1. 01No

    A client wanted to fly a drone through Hall 1 for a promo video.

  2. 02No

    A foreign fund offered to pay for Hall 2. In exchange for a seat on our board.

  3. 03No

    A courier insisted on carrying a parcel all the way to the rack. Parcels stop at the gate.

  4. 04No

    A lock maker offered us free smart locks with a cloud app. Our locks don’t phone home.

  5. 05No

    A contractor asked us to skip the background check. Just this once.

Timeline

  1. 1942

    Construction

    The Swiss army digs Anlage 07 into the Valais Alps.

  2. 1998

    Decommissioned

    The fortress is retired and sealed.

  3. 2022

    Felsen founded

    Three engineers from Valais buy the site.

  4. 2025

    Hall 1 live

    The first 120 racks go online in March. 100 % availability since.

  5. 2026

    Swiss Cloud

    Our own cloud platform opens inside the mountain.

  6. 2027

    Hall 2

    A second hall in the next cavern adds 160 racks.

Where to find us

A rack in the mountain, priced in a day.

Tell us what you need to run. We reply within one business day with a plan and a price.

Request a quote

Tell us what you need. A solutions engineer replies within one business day.

Required

A fixed price within one business day. One reply from an engineer, no sales sequence. We do not run site tours, so you get drawings, photos and audit reports under NDA instead.