Reserve a rack
The portal of Anlage 07 on a winter day, with the roller door half open.

A fortress, carefully repurposed.

Anlage 07 was dug into the Valais Alps in 1942. Our first hall opened in it in March 2025, with 100 % availability since.

From artillery to racks

The Swiss army built Anlage 07 to hold an artillery regiment through a siege. Tunnels, blast doors, air filtration and a spring kept it self-sufficient for months.

It was decommissioned in 1998. We bought it in 2022, kept the shell, the doors and the water, and rebuilt everything else for computing.

A closed original 1942 steel door in a beige-painted corridor.
One of the 1942 doors, kept as it was. Access runs through modern doors and an air lock.
420sq mwhite space today
120racks in Hall 1
1MWIT power today
1.2design PUE

Inside Anlage 07

A slice through the mountain, from the portal to the halls.

A slice through the mountain, from the portal to the halls.
Schematic, not to scale.
  1. 1Portal and loading bay
  2. 2Generators, room for four
  3. 3Fuel, 72 h
  4. 4Transformers, UPS, batteries
  5. 5Cooling plant
  6. 6Hall 1, 120 racks
  7. 7Hall 2, from 2027
  8. 8Mountain water, about 10 °C
  9. 9Escape gallery
  10. 10Up to 120 m of granite
One of the two generator rooms.

01 Power

Two feeds, each enough on its own.

Two 16 kV feeds arrive from two separate substations and run to two 2,000 kVA transformers in separate rooms. Each side carries the full load alone.

  • 2N UPS, LFP batteries in fire-rated rooms
  • 2 generators of 2,000 kVA, N+1
  • 72 hours of fuel, plus a resupply contract
  • Monthly load tests
Pumps and heat exchangers in the cooling plant.

02 Cooling

The mountain does the work.

Fissure water from the rock arrives at about 10 °C, and the granite around the halls stays at about 12 °C. Plate heat exchangers carry the heat away, so there are no chillers.

  • Free cooling all year
  • Heat exchangers and pumps, N+1
  • Rear-door cooling up to 20 kW
  • Water only below the floor, with leak detection and shut-off valves
The arched access tunnel between the portal and the halls.
180 m of 1940s concrete between the portal and Hall 1.
Hall 1 with rows of racks under yellow cable trays.

03 Halls

One hall live, the next one on its way.

Hall 1 is its own fire compartment with gas suppression and early smoke detection. Hall 2 is being fitted out in the next cavern.

  • Hall 1: 420 sq m, 120 racks
  • Hall 2: 560 sq m, from 2027
  • Inert gas suppression
  • VESDA smoke detection
The build room next to the loading bay.

04 Site

Hard to reach, easy to work in.

A paved road leads to the portal building, which holds our offices and staff rooms. Inside the mountain there is a client room, a build room, a loading bay and storage.

  • Loading bay, build room and storage
  • Client room for your engineers
  • A second escape gallery leads out from the halls
  • Exact location shared with clients under contract

Technical specifications

Design standard
Tier III principles, not certified by Uptime Institute
Rock cover
Up to 120 m of granite
White space
420 sq m today, 980 sq m from 2027
IT capacity
1 MW today, 2.5 MW when built out
Rack density
4 to 20 kW per rack
Power feeds
2 × 16 kV from separate substations, 2 × 2,000 kVA dry-type transformers
UPS
2N, lithium iron phosphate (LFP), sides A and B in separate rooms, about 10 min autonomy
Generators
2 × 2,000 kVA, N+1, each in its own room (with Hall 2: 4 × 2,000 kVA, 3+1)
Fuel
72 h at full load, about 25,000 L
Cooling
Mountain water at about 10 °C, plate heat exchangers, free cooling all year
PUE
1.2 design, at full load
Fire protection
Inert gas, VESDA, separate compartments
Blast protection
Original 1940s fortress shell, rock and blast doors
Connectivity
4 carriers over 2 separate fibre routes
Availability
100 % since opening in March 2025
The village below the mountain, which our waste heat helps to warm.

Clean power, reused heat

All our electricity is Swiss hydro. Waste heat warms the school and 30 homes in the village below.

100%renewable power
0.9GWhheat reused per year
0water lost to cooling

A rack in the mountain, priced in a day.

Tell us what you need to run. We reply within one business day with a plan and a price.

Request a quote

Tell us what you need. A solutions engineer replies within one business day.

Required

A fixed price within one business day. One reply from an engineer, no sales sequence. We do not run site tours, so you get drawings, photos and audit reports under NDA instead.